Home    |    Enquiry    |    Contact Us     |    Sitemap
 
 
 
 
 
 
 
 
      Completed projects  
 

During the last 3 years, Aster Rail has commissioned 23 Signaling installations on various Railways. Aster Rail has a record of completing 8 Signaling installations in a short span of 10 months on Southern Railway. Aster Rail is committed to deliver the Signaling installation  to  the toughest targets set by the customers.

 

Sl.No

Stations

 Brief Description

Customer

Nature of Signalling

Type of Signaling

01

02

03

04

Tiruparankundram

Tirumangalam

Kalliguda

Tulukapatti

Provision of Signaling with Centralised operation of Points and Signals

Southern Railway

Rehabilitation of Signalling

 Relay Interlocking.

05

06

07

08

Satur

Kovilpattam

Kumarapuran

Kadambur

Provision of Signaling with Centralised operation of Points and Signals

South Western Railway

Rehabilitation of Signalling

Relay Interlocking.

09

10

Harihar

Davanagare

Provision of Signaling with Centralised Operation of Point and Signals

South Western Railway

Rehabilitation of Signalling

Route Relay Interlocking.

11

12

13

14

Arsikere

Banavar

Devanur

Kadur

Provision of Signaling with Centralised Operation of Point and Signals

South Western Railway

Rehabilitation of Signalling

Major Route Relay Interlocking

Relay Interlocking

15

16

17

Kardi

Tiptur

Honnavalli

Provision of Signaling with Centralised Operation of Point and Signals

Central Railway

Rehabilitation of Signalling

Relay Interlocking.

18

Tondiarpet

Replacement of Existing Signaling

Southern Railway

Rehabilitation of Signalling

Major Route Relay Interlocking

19

20

Bhusawal-Badli

Badli-Jalgaon

Signaling in connection with Conversion of 3 aspect to 4 aspect

Southern Railway

Re-Spacing of Signalling System

Automatic Signaling

21

22

Pimpulkutti

Wani

Provision of Panel Interlocking

Southern Railway

Re-Spacing of Signalling System

Route Relay Interlocking

23

Pudukkottai

Provision of Signalling for Broad Gauge

Southern Railway

Gauge conversion

Interim Signaling

 

Project: Provision of Signaling arrangements at Tiruparankundram, Tirumangalam, Kalligudi and Tullukupatti stations and LC gate Nos. 388, 418 & 419 in connection with replacement of signaling gears with centralised operation of points and signals on Madurai – Vanchi Maniyachi Section.

 

Customer: Southern Railway

 

Scope: Replacement of signaling gears with Centralised operations of Points and    Signals on Madurai – Vanchi Maniyachi section of Southern Railway.

  • Construction of Signaling at 4 stations & Interlocking of Three LC gate
  • Part Design, supply, Construction, testing & commissioning of entire Signaling Scheme along Crossing Gates.

Project Highlights:

  • Design.
  • ‘Q’ Style Relays.
  • Power Supply Equipments.
  • Track Circuits Equipments.
  • Other Signaling Equipments.
 
Services
Signaling Design
Services for Private Railway Lines
Project Management
Projects
Execution of Signaling Projects
Projects in Progress
Completed projects
  © 2012 Aster Rail Private Limited. All Rights Reserved. Privacy Policy